Sedimentation Rate Analysis in Dock C PT. Petrokimia Gresik, Indonesia

Authors

  • Abiyani Choirul Huda Ocean Engineering Department, Institut Teknologi Kalimantan, Balikpapan, Indonesia
  • Rendatiyarso Laksono Ocean Engineering Department, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia
  • Anggie V R Dewi Ocean Engineering Department, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia
  • Rima G Harahap Ocean Engineering Department, Institut Teknologi Kalimantan, Balikpapan, Indonesia
  • Nurwati Ocean Engineering Department, Institut Teknologi Kalimantan, Balikpapan, Indonesia
  • Siti Rahayuningsih Ocean Engineering Department, Institut Teknologi Kalimantan, Balikpapan, Indonesia
  • Destyariani L Putri Ocean Engineering Department, Institut Teknologi Kalimantan, Balikpapan, Indonesia
  • Anggoronadhi Dianiswara Ocean Engineering Department, Institut Teknologi Kalimantan, Balikpapan, Indonesia
  • Muhammad K Wirawan Ocean Engineering Department, Institut Teknologi Kalimantan, Balikpapan, Indonesia

DOI:

https://doi.org/10.52562/injoes.v1i2.237

Abstract

Dock C is one of the supporting facilities at PT. Petrokimia Gresik which functions as loading and unloading goods from ships to land and vice versa. Another benefit of the jetty is that it can significantly increase the company's production capacity. Dock C PT. Petrokimia Gresik. In the treatment of sedimentation in port it is necessary to analyze the current pattern and sedimentation rate early, because this is the first step to predict the amount of sedimentation contained in the port in a certain period of time. Several ways can be done to minimize the rate of sedimentation, one of which is the layout of Dock C to reduce the frequency of dredging. This study compares the sedimentation volume at the existing condition jetty and two alternative jetty that occur due to currents and waves, while modeling is done using Mike 21. The results of the existing jetty modeling show the sedimentation volume for 12 months was 20641.68 m3. Whereas the sedimentation volume from alternative jetty 1 and 2 produced for 12 months was 11293.56 m3 and 7426.2 m3. Modifications to the layout of the jetty provided were able to reduce the rate of sedimentation in Dock C, with the most optimal sedimentation volume for 12 months at 13215.48 m3

Downloads

Download data is not yet available.

References

Ezzeldin, M., Rageh, O., & Saad, M. (2020). Assessment Impact of The Damietta Harbour (Egypt) and Its Deep Navigation Channel on Adjacent Shorelines. Journal of Integrated Coastal Zone Management, 20(4), 265–281.

Hidayat, F., Juwono, P. T., Suharyanto, A., Pujiraharjo, A., Legono, D., Sisinggih, D., Neil, D., Fujita, M. & Sumi, T. (2017). Assessment of sedimentation in Wlingi and Lodoyo reservoirs: A secondary disaster following the 2014 eruption of Mt. Kelud, Indonesia. Journal of Disaster Research, 12(3), 617-630. https://doi.org/10.20965/jdr.2017.p0617

Katsiri, A., Pantazidou, M., Damikouka, I., Kontogiorgi, C., & Tringali, A. (2009). Disposal options for dredged marine sediments based on physicochemical and toxicological characterization. Global NEST Journal, 11, 449–456.

Kohansal, K., Toor, S., Sharma, K., Chand, R., Rosendahl, L., & Pedersen, T. H. (2021). Hydrothermal liquefaction of pre-treated municipal solid waste (biopulp) with recirculation of concentrated aqueous phase. Biomass and Bioenergy, 148, 106032. https://doi.org/10.1016/j.biombioe.2021.106032

Krishna, H., Das, B., Attri, B. L., Kumar, A., & Ahmed, N. (2012). Interaction between different pre-and postharvest treatments on shelf life extension of ‘Oregon Spur’apple. Fruits, 67(1), 31-40. https://doi.org/10.1051/fruits/2011064

Mahmoodi, A., Lashteh Neshaei, M. A., Mansouri, A., & Shafai Bejestan, M. (2020). Study of current-and wave-induced sediment transport in the Nowshahr Port entrance channel by using numerical modeling and field measurements. Journal of Marine Science and Engineering, 8(4), 284. https://doi.org/10.3390/jmse8040284

Nontji, A. (1987). Laut Nusantara. Djambatan.

Novianto, I. M. (2009). Sedimentation Analysis at Domestic Pier of Surabaya Container Terminal (TPS). Institut Teknologi Sepuluh Nopember.

Pratikto, W. A., Fitriadhy, A., Maulana, M. I., Huda, A. C., Putri, D. L., Simatupang, L. A., Wahyudi, N. R., Laksono, R., & Dewi, A. V. R. (2021). The Study of Coastline Changing and Total Suspended Solid Distribution Based on The Remote Sensing Data in Teluk Lamong Multipurpose Port Terminal. IOP Conference Series: Earth and Environmental Science, 698(1). https://doi.org/10.1088/1755-1315/698/1/012046

PT. Petrokimia. (2018). Company Profile.

Putra, S. M. B., Suharyanto, A., & Pujiraharjo, A. (2017). Simulasi Numeris Perubahan Morfologi Dasar Laut Pada Desain Pelabuhan Di Kabupaten Gresik, Indonesia. Jurnal Teknik Pengairan: Journal of Water Resources Engineering, 8(1), 130-138. http://dx.doi.org/10.21776/ub.jtp.2017.008.01.13

Sravanthi, N., Ramakrishnan, R., Rajawat, A. S., & Narayana, A. C. (2015). Application of Numerical Model in Suspended Sediment Transport Studies along the Central Kerala, West-coast of India. Aquatic Procedia, 4, 109-116.

https://doi.org/10.1016/j.aqpro.2015.02.016

Wibowo, M., Hendriyono, W., Rahman, R. A., Susatijo, G., Kongko, W., Istiyanto, D. C., Widagdo, A.B., Nugroho, S., Khoirunnisa, H., Wiguna, E., Aziz, H. & Santoso, B. (2020). Sediment Transport Modeling at Jelitik Estuary, Sungailiat-Bangka Regency for the Design of Sediment Control Structures. Journal of Physics: Conference Series, 1625(1), 012042. IOP Publishing. https://doi.org/10.1088/1742-6596/1625/1/012042

Downloads

Published

2021-12-26

How to Cite

Huda, A. C., Laksono, R., Dewi, A. V. R., Harahap, R. G. ., Nurwati, N., Rahayuningsih, S. ., Putri, D. L. ., Dianiswara, A. ., & Wirawan, M. K. . (2021). Sedimentation Rate Analysis in Dock C PT. Petrokimia Gresik, Indonesia . Indonesian Journal of Earth Sciences, 1(2), 74-83. https://doi.org/10.52562/injoes.v1i2.237

Issue

Section

Articles